Our team worked similar hours to this project. At the start our project was a little bit behind the schedule, because of the late meeting with our client. After that our project proceeded in time and our weekly hours between each member remained the same. At the beginning most of the work like ideation, planning, analysing results and blog writing was done together with the group. Interviews were done individually. During the end of the product development process, each of us had more hours than in the beginning. At the very end tasks were shared and co-working was done online. The steps and results of our human-centered design process can be seen here: https://prezi.com/view/soxmJb7YO7j9nkEB28zG/



TotalWeekly avg
Sami423,82
Jouko423,82
Mikael383,45


The above table shows the total hours and weekly average hours. The table is just a model so every single hour during the weeks are not listed there. The table represents the hours that each member remembered to include. From the table below we can observe the individual end task, the task that are done during group meetings are excluded from the table. From both of the tables we can see that the division between group points is going to be similar with each of the team member.


Task division (excluding work done together in group meetings):
JoukoPlanning and executing user test + interview, filming proto-video, 2 need finding interviews, 2 prototype testing interviews, writing extra blogs
MikaelPlanning and executing user test + interview, filming proto-video, 1 need finding interview, 1 prototype testing interview
SamiPlanning and executing user test + interview, filming proto-video, video editing for both videos